Pre-qualification

The subcontractor pre-qualification pack, built in one click

Insurance, accreditation certificates, policies, RAMS, COSHH, permits, training records and handover certificates, in order, with a cover and contents. Missing or expired items are flagged before you send it.

No card needed · 30-day free trialOperatives freeWorks in any modern browser

One indexed PDF. Everything the PC asked for.

Tick the sections, or let your trade pre-tick them, and G8 ONE builds a cover, a contents page and every document in order.

  • Company details, insurance and accreditation certificates
  • Health and safety policy and your company documents
  • RAMS, COSHH with SDS references, permits and inspections
  • Training and CSCS matrix
  • Plant certificates, handover certificates and CDM documents

Send it as a PDF, or as a live share link that always shows the latest approved versions.

Site Pack
Site Pack export with sections, trade defaults and flagged items

Flagged before you send

Missing or expired items are flagged, so an out-of-date insurance certificate doesn't reach the client.

Pre-qualification set

Share your insurance, policies and accreditations, or the whole pre-qualification set, as one read-only link.

Links you control

Share links can expire and you can revoke them at any time.

Accreditations tracked

Store CHAS, SafeContractor, Constructionline, SMAS, Acclaim, Achilles and other certificates with expiry reminders.

Worker compliance pack

Add the team's cards and certificates as one PDF.

Your branding

Your logo and colours on the cover from the Business plan up.

We help you answer the questionnaire, we don't replace it

Every main contractor has its own pre-qualification questionnaire or portal. G8 ONE keeps the evidence those questionnaires ask for in date and in one place, so answering takes minutes and the attachments are ready. The questionnaire itself is still completed in the contractor's format.

Questions

What goes into the pack?

Whatever you tick: company details, insurance, accreditations, policies, RAMS, COSHH, permits, inspections, the training matrix, plant and handover certificates and CDM documents.

Can I send it as a link instead of a PDF?

Yes. A read-only link always shows the latest approved versions, can expire, and can be revoked.

Does G8 ONE fill in the main contractor's PQQ?

No. It keeps the evidence in date and ready to attach; you complete the questionnaire in the contractor's format.

Build your pre-qualification pack tonight

Upload your insurance and accreditations once and reuse them for every tender.

No card needed. 30-day free trial, then choose a plan.

Start free trialLog in