Health and safety software for electrical contractors
RAMS that know the difference between first fix and an EICR, isolation permits with a lock-out register, and every electrician's ECS card in date before they reach site.
Electrical tasks in the RAMS library
| Task | Hazards it brings in |
|---|---|
| First and second fix wiring | Electric shock, drilling into hidden services and asbestos checks |
| Consumer unit change | Electric shock and safe isolation |
| Containment and tray install | Work at height, drilling, manual handling |
| Testing and inspection (EICR) | Electric shock and live testing controls |
| Chasing walls for cables | Silica dust, noise and vibration |
Electric shock controls include the safe isolation procedure (lock off, prove dead, test, re-prove the tester), cable avoidance, 110V or battery tools and a competent person with the right card. Edit any of them to match your own procedure.
Isolation permits and LOTO
Raise an electrical isolation permit, keep the lock-out tag-out register, and get the permit approved by email link.
ECS and CSCS cards
Cards with the photo, number and expiry, checked against the job dates when you build the RAMS team.
Emergency lighting
BS 5266-1 monthly and annual test templates and completion certificates.
HAVS and noise
Chasing and drilling logged against each person's daily exposure points.
COSHH
Assessments for the sealants, foams and cleaners you use, from the 500+ UK SDS library.
Site Pack
Insurance, accreditations, RAMS and the training matrix in one indexed PDF.
Permits that match the work
When the tasks include isolation or hot works, the RAMS suggests the permit and the method statement adds the step in the right place. Live and awaiting-approval permits are clear on one list.

Questions
Is there an electrical RAMS template?
The RAMS builder has an electrical trade with tasks for first and second fix, consumer unit changes, containment, EICR testing and chasing. For a one-off, try the free RAMS template.
Can I track ECS cards?
Yes, along with CSCS, IPAF, PASMA, first aid, asbestos and your own card types, with reminders before expiry.
Is there a lock-out tag-out register?
Yes, with electrical isolation permits that are issued, suspended, handed back and closed with signatures.
Get your electricians on site faster
Build the RAMS, raise the isolation permit and send the pack.
No card needed. 30-day free trial, then choose a plan.